top of page
Almost half of this 115 MW turbine is a special construction over a flood plain.
The construction is based on 4,500 concrete posts that are rammed into the ground. The upper steel structure is at a height of 3.2 meters supporting an east-west orientation of 3 modules in the portrait.
Our performance
Participation in the development and planning of the system
Creation of the statics
bottom of page